Talk to Gavin
Low energy home at dusk with timber cladding and full-height glazing

Modern methods of construction, delivered properly.

Twenty-five years turning SIPs, timber frame and modular systems into low energy homes and buildings for developers, main contractors and estates teams. We advise, engineer, source, install and build, as one team.

Dynamic NextGen

Most people compare a frame quote against a brick quote. The frame is only part of the picture.

Dynamic NextGen is how we approach a scheme before a system is chosen. System selection, buildability, foundations, programme, site operations and the trades around the structure, looked at together, so labour, materials, waste and site cost come down at the same time. It can be bought on its own as advice, or carried through to delivery by one of our two businesses.

Hybrid ICF and SIPs home under construction with cladding and roofing going on together
01Advise
02Engineer
03Source
04Prepare
05Install
06Build & manage
NextGen Advisory

Already have a system, a scheme or a supply chain? We make it work harder.

Independent MMC advice for developers, main contractors, manufacturers, housing providers and estates teams. We don't sell a system. We've engineered, bought, installed and built with most of them, and we tell you what the numbers say.

System selection

SIPs, timber frame, hybrid or volumetric. Which one fits your design, site, programme and budget, with the trade-offs made plain.

Buildability and cost planning

Early stage engineering, foundations and sequencing reviewed before costs are committed, so the savings are real, not promised.

Programme and site operations

How the structure, roof, envelope and follow-on trades run as one sequence, and what that does to finance and prelims.

MMC strategy for organisations

For manufacturers, contractors and clients adopting offsite: the delivery infrastructure, partners and processes the system needs around it to succeed.

Scheme and bid review

A second pair of eyes on an MMC scheme, tender or framework bid, from someone who has delivered them.

Training and talks

Workshops and lectures on MMC and construction management, as delivered at the University of Wolverhampton and industry events.

Two routes to delivery

One method. Two businesses. The right door for your project.

Charcoal-clad low energy home at dusk

Dynamic Build UK

Principal contractor for low energy homes and small schemes
  • Self-build and replacement dwellings
  • SME developer housing schemes
  • Shell, weathertight or complete build
  • SIPs, timber frame and hybrid offsite systems
Visit Dynamic Build UK
Timber structure going up on site

Dynamic Offsite

Engineer, source and install of superstructures for main contractors and developers
  • SIPs, timber frame and hybrid panelised systems
  • Education, healthcare, later living and residential
  • Five schools delivered as superstructure partner, 2016 to 2022
  • We don't manufacture. We make the system work on site.
Visit Dynamic Offsite
Proof

Numbers, not promises.

£160k

taken out of one scheme through engineering, procurement and delivery

15 days

foundations and structure on a 200 m² home

70

modular apartments installed by a four-person team

5

schools delivered as superstructure partner to main contractors

500+

projects across a 25-year career in MMC

Family by a large window in a warm, light-filled low energy home
Sectors

Where the systems work.

The same method, applied wherever a timber-engineered or hybrid structure makes sense.

Low energy homesResidential developmentsEducationHealthcareLater livingCommercial & retail
Founder

Gavin Wilkes

Headshot to follow

I spent ten years inside market-leading offsite manufacturers, helping Tesco, HomeServe, councils and the NHS change how they build. They succeeded because they had the system and the delivery infrastructure around it.

Then I saw the flip side: the same systems sold to people and organisations without that infrastructure. Some succeeded, many didn't. The difference was always the infrastructure around the system. Dynamic Build Group exists to provide it, and to advise those who want to build their own.

Founding board member of the West Midlands Advanced Construction Cluster. Guest lecturer in MMC and construction management at the University of Wolverhampton.

Work with us

Have a scheme, a site, a building programme or a system you want to get more from?

Message Gavin on LinkedIn or email hello@dynamicbuildgroup.co.uk.